New Windshields
New Tailboom "0" hrs. (It brings the new Bell Design modification)
New Tail Rotor Blades
New Main Rotor Blades "0" hrs.
New Rotor "0" hrs.
New Swash Plate assembly "0" hrs.
New Control Rod Linkage "0" hrs.
All Main Transmission Components and tail transmission are inspected at "0" hrs
New Main transmission Shaft
New interior Trim (Was changed during Air Conditioning Installation)
Air Conditioning Aircom (It´s not a Standard ) Aprox Cost $ 80.000,00
Inlet Barrier Filter AFS replacing the Particle Separator (Increase efficiency and reduce weight)
Auxiliary Fuel Tank. Aprox Cost $ 145.000 without Installation.
Flotation Kit Aeronautical Accesories. Aprox Cost $ 165.000 plus Installation. The system has a Helium Bottle instead of a Nitrogen Bottle.
Tinted Rear windows
LED Landing Lights
REMARKS
NOTES: It is important to consider that Times in Hours and/or Calendar of Inspections and Services described above, logically may be above 0.0 Hrs. / Days needed to Process Standard Airworthiness Certificate, but they cannot be greater than 10 Hrs. / Four (04) Months ...