• Increased MTOW 77.3 t, MLW 63.9 t & MZFW 60.3 t
• Installed with 4 ACTs
• 15 knots Tailwind Certification
• ETOPS EASA 180 min
• Insulation Cover for Ozone Converters Installed
• Installation of Combined VOC/Ozone Catalytic Converters - BASF Corporation, PN 44018005
• Installation of ROPS
• FMGC H3PC19 – FM Kits
• MCDU Basic Equipment – Honeywell
• FMS 4D Required Time of Arrival (RTA)
• Cargo Holds Fire Extinguishers Extended Duration for ETOPS 180 MIN
• Water/Waste Freezing
• Pilot Reading Lights (LED)
• Total Air Temperature (TAT) Probes
• In-Situ Replenishment Facility for Cockpit Oxygen Cylinder
• Auxiliary Compressor in the Potable Water Pressurization System
• Additional Fluid Barriers for APU Access Doors
• Fuselage and Wings Extended Corrosion Prevention
• Belly Fairing Panels
• Ram Air Inlet Leading Edge Protection
• Erosion Protection on Vertical Stabilizer Leading Edge